ENERGY & OIL

The Geosynthetics are widely used in various Oil & Gas and energy Industry applications and opportunities for Geosynthetics in these sectors are nearly endless. There are huge energy categories, such as oil, natural gas and coal, but geosynthetics also play a role in hydropower, wind power, solar power and nuclear energy among others.

Geosynthetics are generally used in storage tanks, support roads to remote sites, tailings ponds, provide filtration, dewater coal ash Ponds, and freshwater storage ponds and tanks. Whatever be your requirement, Ecoline will always have a solution for it. Please get in touch with us to discuss about your project requirements.

Lets take a look at few of the projects that Ecoline has completed in this sector.

WOSL Tank 1731 and Tank 1731 Bund Upgrade

329-3293326_picture-freeuse-business-by-

PRINCIPAL

WIRI OIL SERVICES LTD

kissclipart-duration-icon-clipart-hourgl

DURATION

4 WEEKS 

6-62628_calendar-icon-png-clipart-comput

YEAR

2017

pin-location-icon-iconic-design-vector-1

LOCATION

AUCKLAND, NEW ZEALAND

SUPPLY AND INSTALL

TOTAL QUANTITY OF 30,000 M

2

Upgrade of an existing spillage containment bund including termination of liner system to existing structures, in a live tank farm with significant operation constraints 

WOSL_edited.jpg

Caltex Kurnell Refinery - Onsite Asbestos Containment Cell 

329-3293326_picture-freeuse-business-by-

PRINCIPAL

CALTEX AUSTRALIA

kissclipart-duration-icon-clipart-hourgl

DURATION

3 MONTHS

6-62628_calendar-icon-png-clipart-comput

YEAR

2018

pin-location-icon-iconic-design-vector-1

LOCATION

KURNELL, NSW

SUPPLY AND INSTALL

TOTAL QUANTITY OF 120,000 M

2

Double lined Base and Cap, works included;

GCL HDPE Geomembrane, Conductive Geotextile, Geocomposite, Cushion Geotextile, Leachate Collection PE Pipes, 300mm gravel layer, and onsite CQA testing of Geosynthetics. ARC testing and Dipole Testing of the completed system.

The Purpose of this Containment cell was for the placement of onsite contamination of soil and demolition products as part of the refinery shut down.

IMG_6566_edited.jpg

Blowdown Pond B - Mt Piper Power Station

329-3293326_picture-freeuse-business-by-

PRINCIPAL

ENERGY AUSTRALIA

kissclipart-duration-icon-clipart-hourgl

DURATION

4 WEEKS 

6-62628_calendar-icon-png-clipart-comput

YEAR

2020

pin-location-icon-iconic-design-vector-1

LOCATION

MT. PIPER POWER STATION

BLACKMANS FLAT, NSW

SUPPLY AND INSTALL

TOTAL QUANTITY OF 50,000 M

2

Scope of works includes 2 Stages
Stage 1 : Testing, Repair and make good existing 2mm HDPE Geomembrane (Secondary) 
Stage 2 : Install New 2mm HDPE Geomembrane (Primary) including On-site CQA testing & Arc testing of the Completed System.

This Project was Delivered under significant time constraints whilst complying with Industry best practices. 