Management of water and Mine Waste is a major Environmental and Safety issue in Mines today. At mine sites, geosynthetics have been primarily used as basal liners for heap leach and liquid containment facilities (drainage waters, process solutions, treatment ponds), and to some extent, for tailings and other solid waste storage facilities. Geogrids have been used to stabilize soft soils for road construction and mine tailings for placement of cover soils. Geopipes have been used for conveyance of runoff, drainage, and process waters, and/or for leak-detection systems around mine sites. 

 

Impermeable and semi impermeable liners such as HDPE, LLDPE, BGM's, and Geosynthetic Clay Liner (GCL) allow liquids and other wastes to be contained. The varying level of chemical resistance of these liners means waste can be contained safely into the future. The containment or low permeability function of geosynthetics allows the control a material or contaminant (solid, liquid or gas) from entering the natural environment and/or impacting upon humans. This function allows geosynthetics to be used when a pollutant needs to be contained from entering into the environment and spreading into adjacent pollutant free areas. Geosynthetic containment systems can be a safer, more cost effective and responsible alternative than removal of the pollutant from site.

Lets take a look at few of the projects that Ecoline has completed in this sector.

Cobar Mine (CSA) - Borrow Bit Dam Expansion 

329-3293326_picture-freeuse-business-by-

PRINCIPAL

COBAR MANAGEMENT PTY LTD.

kissclipart-duration-icon-clipart-hourgl

DURATION

1 WEEK 

6-62628_calendar-icon-png-clipart-comput

YEAR

2020

pin-location-icon-iconic-design-vector-1

LOCATION

COBAR, NSW.

SUPPLY AND INSTALL

TOTAL QUANTITY OF 25,000 M

2

Scope of Works include Supply and installation of 2 mm HDPE Double Side Textured Geomembrane , Onsite CQA Testing. This Project was delivered successfully within 7 days. Due to time limitation to deliver the project for the Mine to meet EPA deadlines, Eco Line delivered the project works within a 7 day period besides completely meeting the requirements of Golder and CSA Mine Regulations

photo_2021-05-06_11-53-13.jpg

CWR Emplacement Phase 2 Expansion - Bituminous Liner Installation

329-3293326_picture-freeuse-business-by-

PRINCIPAL

Peabody Energy

kissclipart-duration-icon-clipart-hourgl

DURATION

1 WEEK 

SUPPLY AND INSTALL

 TOTAL QUANTITY OF 3,000 M

2

6-62628_calendar-icon-png-clipart-comput

YEAR

2016

pin-location-icon-iconic-design-vector-1

LOCATION

HELENSBURGH, NSW.

Scope of Works include Supply and installation of Bituminous Geomembrane, Onsite CQA Testing meeting the requirements of Golder and CSA Mine Regulations

IMG_2267.jpeg

AND MANY MORE PROJECTS...