LANDFILL CONSTRUCTION 

Geosynthetic Liners have redefined landfill design and construction from those traditional methods which are now a liability to the environment. Given the broad functionality and durability, high quality Geosynthetics provide superior long term protection to the environment, an asset for future generations.

​

Typically a landfill liner system consists of multiple layers of Geosynthetic Liners including Geomembranes, GCL, Geotextiles and often Geocomposites.

 

Ecoline Solutions is an industry recognised specialised installer of Landfill Geosynthetics delivering nearly 100 landfill projects under NSW and Vic EPA.

Lets take a look at few of the projects that Ecoline has completed in this sector.

AWABA WASTE MANAGEMENT FACILITY CELL 1 & 2

329-3293326_picture-freeuse-business-by-

PRINCIPAL

Lake Macquarie City Council

kissclipart-duration-icon-clipart-hourgl

DURATION

4 MONTHS

6-62628_calendar-icon-png-clipart-comput

YEAR

2019

pin-location-icon-iconic-design-vector-1

LOCATION

AWABA, NSW

SUPPLY AND INSTALL

TOTAL QUANTITY OF 300,000 M

2

Landfill Cell Liner System Comprising of  High Tensile Geogrid, GCL, HDPE and LLDPE Geomembranes, Geocomposite, various types of Geotextiles, Leachate Collection PE Pipes, concrete sump and stainless steel 2205 Riser Pipe. The Scope also includes onsite CQA testing of all materials, ARC testing and Dipole Testing of the completed system. 

IMG_8266_edited_edited_edited.jpg

Glenfield Waste Management Facility Cell X1

329-3293326_picture-freeuse-business-by-

PRINCIPAL

Glenfield Waste Services

kissclipart-duration-icon-clipart-hourgl

DURATION

3 MONTHS

SUPPLY AND INSTALL

6-62628_calendar-icon-png-clipart-comput

YEAR

2019

pin-location-icon-iconic-design-vector-1

LOCATION

GLENFIELD, NSW

TOTAL QUANTITY OF 150,000 M

2

Multiple Liner System - Geosynthetic Clay liners / HDPE Geomembrane / Cushion and Separation Geotextile / Leachate Collection Pipe Works, subgrade preparations, 300mm Gravel Layer, and Sand Placement of 150mm layer. Leachate Collection PE Pipes.  The Scope also includes onsite CQA testing of all materials, ARC testing and Dipole Testing of the completed system.

CF9E37C846FA64CB82F067A5CA64FB20.jpeg

Kimbriki Resource Recovery Centre - Cell 3B & 4A

329-3293326_picture-freeuse-business-by-

PRINCIPAL

Kimbriki Environmental Enterprises

kissclipart-duration-icon-clipart-hourgl

DURATION

Cell 3B - 3 months

Cell 4A - 3 months

SUPPLY AND INSTALL

6-62628_calendar-icon-png-clipart-comput

YEAR

Cell 3B - 2016

Cell 4A - 2020

pin-location-icon-iconic-design-vector-1

LOCATION

TERREY HILLS, NSW

TOTAL QUANTITY OF

CELL 3B - 70,000 M

CELL 4A - 80,000 M

2

2

Specialised Side Wall and Basal Liner System Comprising of  Geocomposite, Geogrids, Geosynthetic Clay Liner, HDPE & LLDPE Geomembranes, Various types of Geotextiles, subgrade preparations, 300mm Thick Gravel Layer, and Leachate Collection PE Pipes. The Scope also includes onsite CQA testing of all materials, Shear Interface Testing, ARC testing and Dipole Testing of the completed system. 

IMG_9626_edited.jpg

Bega Landfill Cell 4

329-3293326_picture-freeuse-business-by-

PRINCIPAL

SUPPLY AND INSTALL

Bega Valley Shire Council

kissclipart-duration-icon-clipart-hourgl

DURATION

1 Month

6-62628_calendar-icon-png-clipart-comput

YEAR

2020

pin-location-icon-iconic-design-vector-1

LOCATION

FROGS HOLLOW, NSW

TOTAL QUANTITY OF 100,000 M

​

2

Regional Landfill Cell Construction. Compliant with NSW EPA (2016) Guidelines comprising of Multiple Liner System - Geosynthetic Clay liners / Geomembranes / Cushion and Separation Geotextile / Leachate Collection Pipe Works. The Scope also includes onsite CQA testing of all materials and ARC testing of the completed system.  

completed%20installation_edited.jpg

Bega Landfill Cell 3

329-3293326_picture-freeuse-business-by-

PRINCIPAL

SUPPLY AND INSTALL

Bega Valley Shire Council

kissclipart-duration-icon-clipart-hourgl

DURATION

1 month

6-62628_calendar-icon-png-clipart-comput

YEAR

2018

pin-location-icon-iconic-design-vector-1

LOCATION

FROGS HOLLOW, NSW

TOTAL QUANTITY OF 80,000 M

​

2

Regional Landfill Cell Construction. Compliant with NSW EPA (2016) Guidelines comprising of Multiple Liner System - Geosynthetic Clay liners / Geomembranes / Cushion and Separation Geotextile / Leachate Collection Pipe Works. The Scope also includes onsite CQA testing of all materials, Shear Interface Testing, ARC testing and Dipole Testing of the completed system.

IMG_7855_edited.jpg

Bega Landfill Cap 1 & 2

329-3293326_picture-freeuse-business-by-
kissclipart-duration-icon-clipart-hourgl
6-62628_calendar-icon-png-clipart-comput
pin-location-icon-iconic-design-vector-1

PRINCIPAL

SUPPLY AND INSTALL

Bega Valley Shire Council

DURATION

3 Weeks Each Stage

YEAR

2018 & 2019

LOCATION

FROGS HOLLOW, NSW

 TOTAL QUANTITY OF 50,000 M

​

2

Regional Landfill Cell Construction. Compliant with NSW EPA (2016) Guidelines comprising of Multiple Liner System - LLDPE Geomembranes and Geocomposite layer. The Scope also includes shear interface testing of proposed materials and onsite CQA testing of all materials of the completed system. 

987525F91258A5E03E84984DB88C26D9_edited.

SUEZ Kemps Creek Cell A9 - Restricted Waste Cell 

329-3293326_picture-freeuse-business-by-

PRINCIPAL

SUEZ

kissclipart-duration-icon-clipart-hourgl

DURATION

2 Month

6-62628_calendar-icon-png-clipart-comput
pin-location-icon-iconic-design-vector-1

YEAR

2020

LOCATION

KEMPS CREEK, NSW.

 TOTAL QUANTITY OF 100,000 M

​

2

Restricted Waste  Cell for placement of Hazardous Waste Products. Compliant with NSW EPA (2016) Guidelines. This Project has a Multiple Liner System - GCL / HDPE / Geocomposite / Cushion Geotextile / Leachate Collection PE Pipes including Rain flap. The Scope also includes onsite CQA testing of all materials, ARC testing of the completed system.

Landfill Cell - Containment of Restricted Waste Products

Photo%206-8-20%2C%2011%2024%2011%20am_ed

SUEZ Kemps Creek Cell A8 - Restricted Waste Cell 

329-3293326_picture-freeuse-business-by-

PRINCIPAL

SUEZ

kissclipart-duration-icon-clipart-hourgl

DURATION

3 Weeks

6-62628_calendar-icon-png-clipart-comput
pin-location-icon-iconic-design-vector-1

YEAR

2018

LOCATION

KEMPS CREEK, NSW.

 TOTAL QUANTITY OF 40,000 M

​

2

Restricted Waste  Cell for placement of Hazardous Waste Products. Compliant with NSW EPA (2016) Guidelines. This Project has a Multiple Liner System - GCL / HDPE / Geocomposite / Cushion Geotextile / Leachate Collection Pipe Works
Leachate Collection PE Pipes including Rainflap. The Scope also includes onsite CQA testing of all materials, ARC testing of the completed system.

Landfill Cell - Containment of Restricted Waste Products

A8 - Not actual.png

SUEZ Kemps Creek Cell A6/A7 -Interface Liner 

329-3293326_picture-freeuse-business-by-
kissclipart-duration-icon-clipart-hourgl
6-62628_calendar-icon-png-clipart-comput
pin-location-icon-iconic-design-vector-1

PRINCIPAL

SUEZ

DURATION

3 Weeks

YEAR

2019

LOCATION

 TOTAL QUANTITY OF 30,000 M

​

2

Restricted Waste  Cell for placement of Hazardous Waste Products. Compliant with NSW EPA (2016) Guidelines. This Project has a Multiple Liner System - LLDPE / Geocomposite / Cushion Geotextile. The Scope also includes onsite CQA testing of all materials, Shear Interface Testing, ARC testing of the completed system.

KEMPS CREEK, NSW.

Landfill Cell - Containment of Restricted Waste Products

IMG_7675_edited.jpg

SUEZ Kemps Creek F Series Cells - F5, F4, F3B, F3A, F2A, F1B , F1A

329-3293326_picture-freeuse-business-by-

PRINCIPAL

SUEZ

kissclipart-duration-icon-clipart-hourgl

DURATION

CELL F2A, F3A, F1A, F1B - 3 WEEKS EACH
CELL F3B, F4, F5
- 2 WEEKS EACH

6-62628_calendar-icon-png-clipart-comput

YEAR

2016 - 2020

pin-location-icon-iconic-design-vector-1

LOCATION

KEMPS CREEK, NSW.

 TOTAL QUANTITY OF 330,000 M

​

2

Compliant with NSW EPA (2016) Guidelines.

The Scope of Works includes Separation Geotextiles and Leachate Collection Pipes.

 

CCL liner with separation geotextiles installed between the CCL and the leachate collection gravel. The Scope also includes onsite CQA testing of all materials of the completed system.

DJI_0004.JPG

HALLAM ROAD LANDFILL - CAPPING

329-3293326_picture-freeuse-business-by-

PRINCIPAL

SUEZ

kissclipart-duration-icon-clipart-hourgl

DURATION

3 MONTHS

6-62628_calendar-icon-png-clipart-comput

YEAR

2020-2021

pin-location-icon-iconic-design-vector-1

LOCATION

HAMPTON PARK, VIC (GREATER MELBOURNE)

INSTALLATION OF

TOTAL QUANTITY OF 150,000 M

2

Landfill Cell Liner System Comprising of  GCL,  LLDPE Geomembranes, Geocomposite, various types of Geotextiles, GAS Collection PE Pipes. The Scope also includes onsite CQA testing of the completed system. 

Photo 14-12-20, 6 10 36 am_edited.jpg

AND MANY MORE PROJECTS...

​

Click below to check out the list of major Projects Ecoline has completed

List of Projects

© 2021-2022 by Ecoline Solutions Pty Ltd. All Rights Reserved.

  • Facebook
  • LinkedIn
bottom of page